CRI Counter Risk Insights

Method

Every CRI analysis follows the same method, so readers can see how a judgement was reached and how much weight it can bear.

Structured analytic techniques

Each analysis names the techniques it uses. The most common are these.

  • Analysis of Competing Hypotheses (ACH). Several explanations are tested against the same evidence. The emphasis lies on evidence that contradicts a hypothesis, since evidence that fits every explanation proves little.
  • Key Assumptions Check. The assumptions behind a judgement are listed and tested, so that a conclusion does not rest on something taken for granted.
  • Indicators. Observable signs are defined in advance that would show a situation moving in one direction or another.

Explicit probability

Words such as “likely” mean different things to different readers. CRI therefore uses a fixed scale. When an analysis says an outcome is likely, it means a probability of 55 to 75 per cent, and the same word always carries the same meaning.

The probability scale

CRI uses the probability yardstick of the UK Professional Head of Intelligence Assessment. The gaps between ranges are deliberate and avoid false precision at the boundaries.

remote chance5% or less
highly unlikely10 to 20%
unlikely25 to 35%
realistic possibility40 to 50%
likely55 to 75%
highly likely80 to 90%
almost certain95% or more

Confidence

Probability and confidence are kept apart. Probability states how likely an outcome is. Confidence states how solid the basis for that judgement is. CRI uses three levels.

  • High. Good quality information from several independent sources.
  • Moderate. Credible information, but with gaps or with sources that cannot be fully corroborated.
  • Low. Fragmentary or doubtful information, or a judgement that rests heavily on assumptions.

Modelling

Where a question involves several uncertain factors, CRI uses Monte Carlo simulation. The model runs thousands of times with values drawn from defined ranges. The result shows the spread of possible outcomes rather than a single forecast. The assumptions and ranges are published with each model.

Sources

CRI uses open sources only. Each source is assessed for reliability and each piece of information for credibility, following the grading used in NATO intelligence practice. Every analysis lists its sources at the end.